On Top List

Owner
Add blog to our blog directory.

Monday, September 26, 2011

FAR Part 77 Objections Affecting Navigable Airspace

FAR Part 77 is one of the most important aspects that must be considered when operating an airport. A duty of airport operations is to keep a close eye on what is happening around the field. It is very common to see unauthorized cranes just boom up. They must have an airspace study performed. If construction is planned within 20,000 ft of an airport or exceeds 200 ft in height, a study must be performed. The form a contractor is required to fill out for this study, FAA form 7460-1 can be downloaded here.
For those interested in how the primary and transitional surfaces around an airport are designated and defined I have provided two videos. For more information please go to www.myairportoperations.com

 


No comments:

Post a Comment